News:

Due to SPAM attacks, new members must be approved before posting.  Please email jclough@warrenpinnacle.com when registering and your account will be approved.

Main Menu
Menu

Show posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.

Show posts Menu

Topics - lsheehan

#1
Hi,

I ran two accretion scenarios for SLAMM and got some interesting results (attached). It seems like the marsh will move up slope, when using the connectivity function, only if it is connected to a tidal flat or channel- is this correct?  Does marsh not move up slope if it is connected to regularly flooded marsh? In my situation, it appears that marsh is only moving into undeveloped dry land when the accretion is low enough that the surrounding marsh is converted to tidal flat.  However, when the accretion allows the marsh to keep up with sea level rise, the marsh doesn't move up slope at all.

I'd like to still use the connectivity feature for some other areas of the site, but is there anyway to edit it so that if dry land is touching regularly flooded marsh it is considered connected? Or am i interpreting how this feature works incorrectly?

Thanks,
Lindsey